Wednesday 16 July 2014

MSEDCL TARIFF

MSEDCL  TARIFF wef 1st June 2015
HT Tariff Consumer Category Demand Charge per KVA per month Energy Charge
HT I : HT- Industry Continuous Industry (on express feeder) 220 7.21
Non-continuous Industry
(not on express feeder)
220 6.71
HT II: HT- Commercial Express Feeder 220 11.15
TELEPHONE EXCH- h Non-express Feeder 220 10.62
LT Tariff Consumer Category                                         ( Sanctioned load ) Demand Charge Energy Charge TOD TARIFF
LT I (B) LT: Residential         applicable to residential quarters & there common facilities such as LIFT, PUMP,CL  etc. 1-100 units Single phase Rs 50, Three phase Rs 150 ,additional Rs 150 per 10 KW  OR part thereof above 10 KW. 3.76
101-300 units 7.21
301-500 units 9.95
501-1000 units 11.31
above 1000 units 12.5
LT II: LT– Non-Residential or Commercial 0-20 kW 220 per month 6.6 0 to 200 units per month optionally available to  having ToD meter installed.
TELEPHONE EXCH- g 9.62 Above 200 units per month
(only balance consumption
> 20 kW and ≤ 50 kW 220 per KVA per month 10.2 applicable
> 50 kW 220  per KVA per month 13.01 applicable
LT V: LT- Industry 0 - 20 kW
(upto and including 27 HP)
220 per connection per month 5.51 optionally available  having ToD meter installed.
Above 20 kW
(above 27 HP)
150 per kVA per month 6.98 applicable



TOD  TARIFF
0600 to 0900 hours  0.00 B Zone
0900 to 1200 hours 0.80 C Zone
1200 to 1800 hours  0.00 B Zone
1800 to 2200 hours  1.10 D Zone
2200 to 0600 hours  -1.50 A Zone






MSEDCL  TARIFF wef 1st Augest 2012
HT Tariff Consumer Category Demand Charge per KVA per month Energy Charge
HT I : HT- Industry Continuous Industry (on express feeder) 190 7.01
Non-continuous Industry
(not on express feeder)
190 6.33
HT II: HT- Commercial Express Feeder 190 10.45
TELEPHONE EXCH- h Non-express Feeder 190 9.83
HT IX - Public Services Express Feeder 190 8.21
Non-express Feeder 190 7.65
LT Tariff Consumer Category                                         ( Sanctioned load ) Demand Charge Energy Charge TOD TARIFF
LT II: LT– Non-Residential or Commercial 0-20 kW 190 per month 5.85 0 to 200 units per month optionally available to  having ToD meter installed.
TELEPHONE EXCH- g 8.38 Above 200 units per month
(only balance consumption
> 20 kW and ≤ 50 kW 190 per KVA per month 8.44 applicable
> 50 kW 191 per KVA per month 10.91 applicable
LT V: LT- Industry 0 - 20 kW
(upto and including 27 HP)
190 per connection per month 5.06 optionally available  having ToD meter installed.
Above 20 kW
(above 27 HP)
130 per kVA per month 7.01 applicable
LT X: LT- Public Services 0-20 kW 190 per kVA per month 5.36 0 to 200 units per month optionally available to  having ToD meter installed.
7.88 Above 200 units per month
(only balance consumption
> 20 kW and ≤ 50 kW 190 per kVA per month 7.79 applicable
> 50 kW 191 per kVA per month 8.24 applicable
TOD  TARIFF
0600 to 0900 hours  0.00 B Zone
0900 to 1200 hours 0.80 C Zone
1200 to 1800 hours  0.00 B Zone
1800 to 2200 hours  1.10 D Zone
2200 to 0600 hours  -1.00 A Zone -2.5 wef Jan 2013
Power Factor Incentive
Whenever the average power factor is more than 0.95, an incentive shall be given at the rate of the following percentages of the amount of the monthly bill including energy charges, reliability charges, FAC, and Fixed/Demand Charges, but excluding Taxes and Duties.
Note:PF to be measured/computed upto 3 decimals, after universal rounding off.
Range of Power Factor Power Factor Level Incentive
0.951 to 0.954 0.95 1%
0.955 to 0.964 0.96 2%
0.965 to 0.974 0.97 3%
0.975 to 0.984 0.98 4%
0.985 to 0.994 0.99 5%
0.995 to 1.000 1.00 7%
Power Factor Penalty
Range of Power Factor Power Factor Level Penalty
0.895 to 0.900 0.90 0%
0.885 to 0.894 0.89 2%
0.875 to 0.884 0.88 3%
0.865 to 0.874 0.87 4%
0.855 to 0.864 0.86 5%
0.845 to 0.854 0.85 6%
0.835 to 0.844 0.84 7%
0.825 to 0.834 0.83 8%
0.815 to 0.824 0.82 9%
0.805 to 0.814 0.81 10%
Note:
PF to be measured/computed upto 3 decimals, after universal rounding off.
Applicable for HT I, HT II, HT IV, HT V, HT VI and IX categories, as well as LT II (B), LT II (C),
LT III, LT V (B), LT X (B) and LT X (C) categories
Penalty for exceeding Contract Demand
In case, a consumer (availing Demand based Tariff) exceeds his Contract Demand, he will
be billed at the appropriate Demand Charge rate or the Demand actually recorded
and will be additionally charged at the rate of 150% of the prevailing Demand
Charges (only for the excess Demand over the Contract Demand).
In case any consumer exceeds the Contract Demand on more than three occasions
in a calendar year, the action taken in such cases would be governed by the Supply Code.
Billing Demand for LT Consumer Categories
Billing Demand for LT II (B), LT II (C), LT III and LT V (B) category having MD based tariff:-
Monthly Billing Demand will be the higher of the following:
a) 65% of the Actual Maximum Demand recorded in the month during 0600
hours to 2200 hours
b) 40% of the Contract Demand
Billing Demand for HT Consumer Categories
Billing Demand for HT I, HT II, HT III, HT IV, HT V, HT VI, and HT VII) Monthly Billing Demand
will be the higher of the following:
i. Actual Maximum Demand recorded in the month during 0600 hours to 2200
hours
ii. 75% of the highest billing demand recorded during the preceding eleven
months, subject to the limit of Contract Demand
iii. 50% of the Contract Demand.
Sanctioned Load
Sanctioned Load means load in Kilowatt (kW) mutually agreed between MSEDCL and the
consumer.
In case the meter is installed on the LV/MV side, the methodology to be followed for
billing purpose is as follows
• 2% to be added to MV demand reading, to determine the kW or kVA billing
demand, and
• ‘X’ units to the MVA reading to determine the total energy compensation to
compensate the transformation losses, where is calculated as follows
‘X’ = (730 * KVA rating of transformer)/500 Units/month, to compensate for the iron
losses, plus one percent of units registered on the LT side for copper losses.
Contract Demand
Contract Demand means demand in Kilowatt (kW) / Kilo –Volt Ampere (kVA), mutually
agreed between MSEDCL and the consumer as entered into in the agreement or agreed
through other written communication (For conversion of kW into kVA, Power Factor of
0.80 shall be considered).